Hardwood, engineered, vinyl, tile. New installs, refinishing, repair. We diagnose subfloors, fix squeaks, and finish edges no one else gets right.
A flooring crew that doesn't understand structure leaves you with squeaks, gaps, and uneven seams in 18 months. Our builder background means we look at the joists, the subfloor, and the moisture levels — not just what goes on top.
Site-finished or pre-finished, refinishing, plank install, repair of damaged boards and squeaks.
Floating floors, click-lock, glue-down. Underlayment, transitions, baseboards.
Waterproof options for kitchens, baths, basements. Quiet, durable, dog-friendly.
Porcelain, ceramic, marble. Heated floors, large-format, herringbone, custom patterns.
Damaged boards swapped, tiles re-set, squeaks tracked down to the joist that's causing them.
Sand, stain, seal — water-based or oil-based. Dust-controlled equipment, clean finish.






1–3 days for an average main-floor hardwood install (1,000–1,200 sq ft). Tile is slower because of cure times — typically 3–5 days for a kitchen or 2 days for a bathroom.
Yes — included in our quote. We carefully tear out, dispose, and prep the subfloor before new flooring goes down.
Often, yes. We have access to systems like Squeeeeek No More that fasten through the floor into the joist. Where that won't work, we open the ceiling below and re-fasten directly.