Powder rooms to ensuites — tile, vanity, plumbing, lighting, glass enclosures. Permits, trades and timelines all managed by one BuildMan project lead.
Most bathroom contractors are tile guys, plumbers, or general handymen. We've built entire homes — so we understand waterproofing, ventilation, structural changes, and finishing the way an architect would specify it.
Porcelain, ceramic, marble, large-format, herringbone, custom patterns. Heated floors and niches included.
Floating, double-sink, custom-built. Quartz or stone tops, soft-close drawers, integrated lighting.
Layout changes, rough-ins, fixture supply, faucets, toilets, bidets, body sprays — fully permitted.
Frameless and semi-frameless shower glass, custom measurements, low-iron options for crystal clarity.
Recessed, sconces, mirror lighting, GFCI receptacles, fan upgrades, smart switches — all to code.
Hydro Ban, Schluter Kerdi, or equivalent membrane systems behind every shower wall and floor.
Every bathroom is different, but here is what our Toronto clients typically invest by project type. These are all-in ranges covering labour, standard materials, permits and project management — final pricing follows a fixed quote after we walk the space.
| Project type | Typical 2026 range | Usual timeline |
|---|---|---|
| Powder room refresh | $12,000 – $18,000 | 1–2 weeks |
| Standard family bathroom | $22,000 – $45,000 | 2–4 weeks |
| Small bathroom (full gut) | $18,000 – $30,000 | 2–3 weeks |
| Master ensuite (custom glass, niches, heated floor) | $35,000 – $75,000+ | 3–5 weeks |
The biggest cost drivers are tile selection and coverage, whether the layout (and plumbing) moves, and vanity and fixture grade. For a full breakdown of what a smaller bathroom really costs and where the money goes, read our Small Bathroom Renovation Cost in Toronto (2026) guide. Renovating outside the city core? See Bathroom Renovation Mississauga.






2–4 weeks for a standard family bathroom, including permits and inspections. Powder rooms can be done in 1–2 weeks. We give you a daily schedule before we start, and you'll know exactly when each trade is on-site.
Yes — Toronto building permit, plumbing permit, and electrical permit are all part of our service. We file, schedule, and pass inspections so you don't deal with the city.
Powder rooms start around $12,000–$18,000. Standard bathrooms are typically $22,000–$45,000 depending on tile, vanity, and fixture selections. Master ensuites with custom glass and niches range $35,000–$75,000+. See our 2026 cost table above for a full breakdown.
A full gut-and-replace of a small bathroom typically runs $18,000–$30,000 in 2026, depending on tile coverage and whether the layout moves. Our detailed Small Bathroom Renovation Cost guide walks through exactly where the budget goes.
Yes. We're happy to install client-supplied fixtures and finishes — we'll just confirm specs and dimensions before delivery to make sure everything fits.
Only if you relocate fixtures. Keeping the toilet, tub and vanity roughly where they are keeps costs down; moving them means new rough-ins and a permit, which we handle and price up front so there are no surprises.
We can refer you to home improvement financing partners. Most clients use HELOCs or pay in milestone payments tied to project progress.