(905) 660-9992 Mon–Sat 8 AM – 6 PM Licensed · Certified · Insured Toronto · GTA · Ontario
★★★★★ 5.0 · 52 reviews · Same-day appointments
Last updated ·Reviewed by the BuildMan project team — home builders since 2008
The short answer

BuildMan renovates bathrooms across Toronto and the GTA, from powder rooms to master ensuites, with permits, trades and inspections managed by one project lead. Powder rooms start around $12,000–$18,000, standard bathrooms typically run $22,000–$45,000 and ensuites $35,000–$75,000+. A standard family bathroom takes 2–4 weeks. Call (905) 660-9992 or request a free in-home consult for a fixed-price quote.

Bathroom Renovation

A bathroom that actually works — and lasts 25+ years.

Most bathroom contractors are tile guys, plumbers, or general handymen. We've built entire homes — so we understand waterproofing, ventilation, structural changes, and finishing the way an architect would specify it.

  • End-to-end management. Demo, plumbing rough-ins, tile, vanity, lighting, fixtures — one team, one bill, one project lead.
  • Permits handled. Toronto building permit, plumbing permit, electrical permit — we file, schedule, and pass inspections.
  • Waterproofing done right. Schluter Kerdi, Hydro Ban, or equivalent — every shower built to last decades, not seasons.
  • Fixed-price quote. Walk through the project once with our designer, then a single all-in number.
  • 2–4 week typical timeline. We don't disappear mid-job — every BuildMan project has a daily-active project lead.
Discuss Your Project →
Bathroom Renovation project by BuildMan
300+Bathrooms
renovated
What we deliver

Every part of your bathroom — handled

Tile & Stone

Porcelain, ceramic, marble, large-format, herringbone, custom patterns. Heated floors and niches included.

Vanity & Cabinets

Floating, double-sink, custom-built. Quartz or stone tops, soft-close drawers, integrated lighting.

Plumbing & Fixtures

Layout changes, rough-ins, fixture supply, faucets, toilets, bidets, body sprays — fully permitted.

Glass Enclosures

Frameless and semi-frameless shower glass, custom measurements, low-iron options for crystal clarity.

Electrical & Lighting

Recessed, sconces, mirror lighting, GFCI receptacles, fan upgrades, smart switches — all to code.

Waterproofing

Hydro Ban, Schluter Kerdi, or equivalent membrane systems behind every shower wall and floor.

2026 Pricing

What a bathroom renovation costs in Toronto (2026)

Every bathroom is different, but here is what our Toronto clients typically invest by project type. These are all-in ranges covering labour, standard materials, permits and project management — final pricing follows a fixed quote after we walk the space.

Project type Typical 2026 range Usual timeline
Powder room refresh$12,000 – $18,0001–2 weeks
Standard family bathroom$22,000 – $45,0002–4 weeks
Small bathroom (full gut)$18,000 – $30,0002–3 weeks
Master ensuite (custom glass, niches, heated floor)$35,000 – $75,000+3–5 weeks

The biggest cost drivers are tile selection and coverage, whether the layout (and plumbing) moves, and vanity and fixture grade. For a full breakdown of what a smaller bathroom really costs and where the money goes, read our Small Bathroom Renovation Cost in Toronto (2026) guide. Renovating outside the city core? See Bathroom Renovation Mississauga.

Planning your budget? Read our builder-written guide: Small Bathroom Renovation Cost in Toronto (2026) →
Real BuildMan projects

Bathrooms we've built

See more in our project gallery →

Why BuildMan

Builder-grade experience you can verify

A renovation is a major investment in your home. Here's the experience and accountability behind every BuildMan project.

Home builders since 2008

15+ years building and renovating GTA homes from the ground up — not a general handyman doing renovations on the side. That structural knowledge is why our finishes last.

Licensed, $2M insured & WSIB-covered

Full liability insurance and WSIB coverage on every trade on your site, so your home and our crew are protected throughout the build.

Free in-home consultation

Every project starts with a free in-home consult — we walk the space with you, talk through options and give you a clear quote before any work begins.

Fixed-price, one project lead

A single all-in quote and one point of contact from demo to sign-off. No open-ended hourly billing, no chasing five separate trades.

5.0★ on Google

Real, verified reviews from GTA homeowners — read them on our Google listing.

Permits & inspections handled

We file, schedule and pass every required building, plumbing and electrical permit and inspection — you never deal with the city.

In depth

What Drives the Cost and Lifespan of a Toronto Bathroom Remodel

Most bathrooms we open up in Toronto come from one of three eras, and each hides something different. Pre-war semis in Leslieville, the Danforth and the Annex often have a cast-iron stack, galvanized supply lines and plaster over lath. Post-war bungalows in Scarborough, Etobicoke and North York tend to have a mortar-bed tub surround and joists notched years ago for a drain. Newer homes in Vaughan, Markham and Mississauga usually have builder-grade tile on plain drywall with no waterproofing membrane. Knowing which one you have is what lets us quote a fixed price without padding it.

Where the budget actually goes

  • Layout: keeping the toilet, tub and vanity on their existing drains is the biggest single saving. Moving a toilet means rerouting a 3-inch drain, which in a two-storey house usually means opening the ceiling below.
  • Tile size and coverage: large-format porcelain needs flatter walls and floors than small tile, so prep labour rises with it. Floor-to-ceiling tile adds more than most people expect.
  • Shower type: a curbless walk-in shower needs the subfloor recessed between the joists so the floor can slope to a linear drain. That is framing work, not just tile.
  • Glass: frameless glass is measured only after the tile is finished, so it is always the last item in.

Sequence matters as much as materials. A proper renovation runs demolition, then plumbing and electrical rough-ins, then the city inspection while walls are open, then the membrane with a flood test on the shower pan before a single tile goes down. Skipping that test is a common reason a new shower leaks within a few years, and the damage shows up in the ceiling below, not in the bathroom.

Two code items get missed constantly in low-bid jobs: the exhaust fan must vent outdoors, not into the attic or a soffit cavity, and receptacles near water need GFCI protection. Any new circuit is done by a licensed electrician under ESA rules, which we coordinate as part of the job.

If you are planning a smaller room first, our small bathroom renovation cost guide breaks the budget down line by line. For a quick fixture swap without a full remodel, see our plumbing fixture installation service.

FAQ

Bathroom Renovation — common questions

How long does a typical bathroom renovation take?

2–4 weeks for a standard family bathroom, including permits and inspections. Powder rooms can be done in 1–2 weeks. We give you a daily schedule before we start, and you'll know exactly when each trade is on-site.

Do you handle permits?

Yes — Toronto building permit, plumbing permit, and electrical permit are all part of our service. We file, schedule, and pass inspections so you don't deal with the city.

What's the typical price range?

Powder rooms start around $12,000–$18,000. Standard bathrooms are typically $22,000–$45,000 depending on tile, vanity, and fixture selections. Master ensuites with custom glass and niches range $35,000–$75,000+. See our 2026 cost table above for a full breakdown.

How much does a small bathroom renovation cost in Toronto?

A full gut-and-replace of a small bathroom typically runs $18,000–$30,000 in 2026, depending on tile coverage and whether the layout moves. Our detailed Small Bathroom Renovation Cost guide walks through exactly where the budget goes.

Can I supply my own tile or fixtures?

Yes. We're happy to install client-supplied fixtures and finishes — we'll just confirm specs and dimensions before delivery to make sure everything fits.

Do you need to move the plumbing to change my layout?

Only if you relocate fixtures. Keeping the toilet, tub and vanity roughly where they are keeps costs down; moving them means new rough-ins and a permit, which we handle and price up front so there are no surprises.

Do you offer financing?

We can refer you to home improvement financing partners. Most clients use HELOCs or pay in milestone payments tied to project progress.

Do I need a permit to renovate a bathroom in Toronto?

If you move plumbing or change electrical, yes — the City of Toronto requires a permit, and we file and pass it for you. A like-for-like cosmetic update (new vanity, toilet, tile in the same spots) usually doesn't. We confirm on the first visit.

How do you waterproof a shower so it doesn't leak?

We use a proper membrane system — Schluter Kerdi, Hydro Ban or equivalent — behind every shower wall and floor, not just water-resistant board. It's the single most important step for a bathroom that lasts, and it's standard on every BuildMan reno.

Can you renovate a small or basement bathroom?

Yes. Small bathrooms and basement baths are common projects; basement baths often need a sump or sewage-ejector pump to lift waste to the main drain, which we handle. We'll tell you what your specific layout needs up front.

Related services

You might also need

Ready to start?

Get a free bathroom renovation quote today.

Same-day appointments. Flat-rate pricing. Workmanship guarantee.

15+ Years Building
3,000+ Jobs Completed
5.0★ · 52 reviews
$2M Liability Insured
WSIB Covered
Workmanship Guarantee
📞 Call Book Online