(905) 660-9992 Mon–Sat 8 AM – 6 PM Licensed · Certified · Insured Toronto · GTA · Ontario
★★★★★ 5.0 · 49 reviews · Same-day appointments
Last updated ·Reviewed by the BuildMan project team — home builders since 2008
Builder-trained, not just handymen

Why homeowners trust BuildMan

We're a handyman service run by professional home builders. 15+ years building homes from foundation to finish means we diagnose the real problem the first time, use the right method, and stand behind the result.

Home builders since 2008
Licensed & $2M insured
WSIB covered
Tarion-registered builder
1-year workmanship guarantee
5.0★ on Google
★★★★★
“Awesome experience very happy with my service..... the guys were fantastic and very helpful... Will definitely recommend their services. And be using them in the future. Thanks again guys”
JM
Jason Mcmillan
3 months ago · Google review
★★★★★
“Thank you Buildman, thank you Shon! We are very happy with your rebuild of the bottom half of our Dutch door on our outdoor cabana. It looks absolutely amazing! Love it! Shon we appreciate your attention to details and craftmanship. Cheers!”
BA
Bob and Sandra Lukewich
3 months ago · Google review
★★★★★
“If you’re looking to get any construction work done, look no further than Shon and the crew at Build man. From start to finish, the professionalism, attention to detail, and work ethic were next level. They didn't just meet expectations; they completely blew them out of the water. Super reliable, clean, and top-tier…”
AJ
Adrian Johnston
3 months ago · Google review

★★★★★ Rated 5.0 on Google across 49 reviews · Read them on Google →

By BuildMan · Flooring installation by home builders · Updated

The short answer

In the Toronto area in 2026, installed hardwood flooring typically costs about $11–$20 per sq ft for solid hardwood and $9–$17 for engineered, with laminate and luxury vinyl plank lower. Removal, subfloor levelling, stairs and trim add to the total. An average main-floor install of 1,000–1,200 sq ft takes 1–3 days. BuildMan measures your space and gives one fixed-price quote; call (905) 660-9992 to book.

Hardwood is still the floor most Toronto homeowners ask for when they redo a main floor, and the installed price varies more than people expect. Two quotes for the same 1,000 sq ft can be far apart because one includes removing old carpet and tile, levelling a dipping subfloor, new baseboards and stair nosings, and the other does not. This guide breaks down typical GTA installed costs per square foot in 2026, explains solid vs engineered hardwood, and lists the prep work that makes the difference between a floor that lasts and one that squeaks, cups or gaps by the second winter.

Typical installed cost per square foot in the GTA (2026)

The figures below are typical market ranges for material plus installation in the Greater Toronto Area. They are not BuildMan quotes: we measure your space and give you a single fixed price that includes the prep your floor actually needs.

Flooring typeTypical installed range (per sq ft)Best suited to
Solid hardwood (3/4", site-installed, prefinished)$11–$20Main and upper floors over a wood subfloor
Engineered hardwood$9–$17Basements, over concrete, condos, radiant heat
Laminate$5–$9Budget-conscious rooms, rentals, high-traffic areas
Luxury vinyl plank (LVP)$6–$11Basements, kitchens, laundry and other wet-prone areas

Exotic species, wide planks (7 inches and up), herringbone or chevron patterns and site-finished floors sit at or above the top of these ranges. Extras such as removal, levelling, stairs and trim are usually priced separately and are covered below.

Solid vs engineered hardwood

Solid hardwood is a single piece of wood, usually 3/4 inch thick, nailed to a plywood or OSB subfloor. It can be sanded and refinished several times over its life, which is why it suits the main floor of a detached house or semi in neighbourhoods like Leaside or the Danforth where the floor is expected to last decades. Its weakness is moisture: solid wood expands and shrinks with humidity, so it is not recommended below grade or glued directly over concrete.

Engineered hardwood has a real-wood wear layer bonded to a cross-laminated plywood or HDF core. The core makes it much more dimensionally stable, so it is the right choice for basements, over concrete slabs, in most condos and over radiant floor heating. It can be floated, glued or nailed. A thicker wear layer allows it to be refinished one or more times; a thin wear layer may only allow a light screen-and-recoat.

In practice, many Toronto homes end up with both: solid hardwood upstairs and on the main floor, engineered or LVP in the basement.

Subfloor prep and levelling

Most hardwood problems start below the boards. Toronto’s older housing stock, such as 1920s semis, postwar bungalows in Scarborough and Etobicoke, and 1970s split-levels, often has subfloors with dips, humps, loose sheathing or old plank subfloors that have shrunk over the years.

  • Flatness. Manufacturers specify how flat the subfloor must be, usually within a small tolerance over a set distance. High spots are sanded or planed; low spots are filled with patching or self-levelling compound.
  • Fastening. Loose subfloor is screwed down to the joists before installation. It is the simplest, lowest-cost way to prevent squeaks.
  • Damaged sections. Water-stained or soft subfloor near old bathrooms, kitchens and exterior doors is cut out and replaced.
  • Concrete. Basement and condo slabs are ground or levelled, cleaned and checked for moisture before engineered flooring or LVP goes down.

Typical GTA market pricing for levelling runs from a few dollars per square foot for spot patching to more for full self-levelling pours. Budget for some prep in any house over about 30 years old.

Moisture testing and acclimatization

Wood flooring reacts to humidity, and Toronto swings from humid summers to very dry, furnace-heated winters. Before installation, a good installer checks the moisture content of both the subfloor and the flooring with a meter, and on concrete performs a moisture test as required by the manufacturer. Hardwood is delivered to the home and left to acclimatize to normal living conditions, with the heat or air conditioning running, for the period the manufacturer recommends. Installing wood that is too wet or too dry for the house is a common cause of gaps in winter and cupping in summer. After installation, keeping indoor humidity in a moderate range year-round, often with a humidifier in winter, protects your investment.

Removal and disposal of old floors

Ripping out carpet and underpad is quick. Removing ceramic tile set in a mortar bed, glued-down parquet or sheet vinyl stuck to old plywood is slow, dusty and heavy. Typical GTA market pricing for removal and disposal ranges from about $1 to $4 per square foot depending on the material, with tile and glued flooring at the top end. Older sheet vinyl and some old adhesives can contain asbestos, so if your house was built before the 1990s, have suspect materials tested before anyone starts scraping.

Stairs, transitions and baseboards

Stairs are where a flooring budget most often surprises people. Matching hardwood treads, risers and nosings is precise carpentry, and each step is priced individually. Capping existing stairs, replacing carpeted stairs with hardwood treads and refinishing an existing staircase are three different scopes with very different prices. If your staircase is part of the plan, see our stairs service.

Also budget for:

  • Transitions. Reducers, T-mouldings and thresholds where hardwood meets tile, carpet or a different floor height.
  • Baseboards and shoe moulding. Old baseboards often crack on removal, and new flooring can change the floor height enough that existing trim looks wrong. New baseboards are usually the cleaner result.
  • Doors. A thicker floor may mean trimming the bottoms of interior doors.
  • Moving furniture and appliances. Clarify who handles it before the start date.

Condo flooring: acoustic underlay rules

If you live in a Toronto condo, check your corporation’s rules before you buy flooring. Most condominium corporations require hard flooring to be installed over an approved acoustic underlay that meets a minimum sound-rating, and many require you to submit the product specs and get written approval before work starts. Some also restrict working hours, require elevator bookings and limit where materials can be cut. Engineered hardwood or LVP over an approved underlay is the usual approach. Ignoring the rules can lead to a neighbour complaint and an order to remove a brand-new floor.

Refinishing vs replacing

Before you tear out an old oak or maple floor, ask whether it can be refinished. Solid hardwood that is worn, scratched or an outdated colour can often be sanded back to bare wood and recoated for far less than new flooring, typically a few dollars per square foot in the GTA market. Replacement makes more sense when boards are water-damaged or cupped, when the floor has already been sanded too many times and the tongue is exposed, when the existing floor is a thin engineered product or when you want a different layout or product. Isolated damaged boards can often be repaired or replaced without redoing the whole room; our floor and tile repair service handles that kind of job.

How long does installation take?

An average main-floor hardwood install of 1,000 to 1,200 sq ft takes 1–3 days once prep is done. Removal, levelling and stairs add time. Tile is slower because mortar and grout need cure time, so mixed hardwood and tile projects are scheduled accordingly.

JobWhat affects the schedule
Main-floor hardwood (1,000–1,200 sq ft)1–3 days of installation
Removal of old flooringMaterial type: carpet is quick, mortar-bed tile is slow
Subfloor levellingSelf-levelling compound needs drying time before flooring
StairsNumber of steps, capping vs new treads, finishing
Tile areasMortar and grout cure times

Maintenance that keeps hardwood looking new

  • Use felt pads under furniture and mats at entrances to catch road salt and grit in winter.
  • Sweep or vacuum with a hard-floor setting; clean with a damp, not wet, mop and a cleaner approved by the flooring manufacturer.
  • Keep indoor humidity moderate year-round to limit gaps and cupping.
  • Wipe up spills and pet accidents quickly, especially along board seams.
  • Plan a screen-and-recoat when the finish looks dull, before wear reaches bare wood.

The bottom line

In the GTA in 2026, installed hardwood typically runs about $11–$20 per sq ft for solid and $9–$17 for engineered, with laminate and LVP lower. The real difference between quotes is usually prep: removal, levelling, moisture control, stairs and trim. Choose solid hardwood for main floors over wood subfloors, engineered for basements, concrete, condos and radiant heat, and refinish rather than replace when the existing floor allows. BuildMan has been building and renovating GTA homes since 2008. We measure, then give you one fixed price. See our flooring installation service or call (905) 660-9992.

More BuildMan guides & services:

Get a fixed price for your new floors

We measure, check your subfloor and moisture, then quote one fixed price including removal, prep, stairs and trim. Call (905) 660-9992 or request a quote.

Get My Free Quote →

Frequently asked questions

How much does hardwood flooring cost per square foot in Toronto?

Typical GTA market ranges in 2026 are about $11–$20 per sq ft installed for solid hardwood and $9–$17 for engineered hardwood. Laminate is roughly $5–$9 and luxury vinyl plank $6–$11. These are market ranges, not BuildMan quotes; we give a fixed price after measuring.

Is engineered hardwood better than solid hardwood?

Neither is better everywhere. Solid hardwood suits main and upper floors over a wood subfloor and can be refinished many times. Engineered hardwood is more stable, so it is the better choice for basements, over concrete, in condos and over radiant floor heating.

How long does it take to install hardwood floors?

An average main-floor hardwood install of 1,000–1,200 sq ft takes 1–3 days. Removing old flooring, levelling the subfloor and stairs add time. Tile takes longer because of mortar and grout cure times.

Can I install hardwood in my Toronto condo?

Usually yes, but most condo corporations require an approved acoustic underlay and written approval before work starts. Engineered hardwood or luxury vinyl plank over an approved underlay is the common approach. Check your building’s rules first.

Should I refinish or replace my hardwood floors?

Refinish if the floor is solid hardwood with enough thickness left and the damage is surface wear, scratches or an outdated colour. Replace if boards are water-damaged, cupped, sanded too thin or if you want a different product or layout.

BM
Written by the BuildMan team

Home builders serving Toronto & the GTA since 2008 — a handyman and renovation company run by professional builders. Licensed, $2M insured, WSIB-covered and Tarion-registered, with a 5.0★ Google rating from GTA homeowners. More about BuildMan →

15+ Years Building
3,000+ Jobs Completed
5.0★ · 49 reviews
$2M Liability Insured
WSIB Covered
Workmanship Guarantee
📞 Call Book Online